Events: Viatris Engineering Operations Transformation 09.06.21

CG Power Solutions

SDC Trailers

Mylan

Largo Foods

Save up to 80% in maintenance costs and achieve 99% uptime in operations

On Wednesday 9th June last, PEMAC hosted The Viatris Engineering Operations Transformation Webinar. Wesley Horan, Senior Engineering Operations Director was the guest speaker at this event which attracted a large online audience.

 Wesley shared his story about the pressures for pharmaceutical plant efficiency that led to a transformation with many landmark achievements. These included transforming Viatris Dublin to a 100% paperless maintenance environment, more than 3x improvement in Mean Time Between Failures (MTBF), a 64% reduction in maintenance costs and an engineering time saving of 75%.


About Viatris:

In November 2020, Viatris formed a $12 billion revenue global organisation from a merger of Pfizer Upjohn and Dutch headquartered Mylan. Viatris has a global workforce of over 45,000 with a balanced reach across North America, Europe, the Asia Pacific region and emerging markets.

Viatris’ product portfolio includes both iconic global key brands and generics, including branded and complex generics; biosimilars; and over-the-counter offerings across a wide range of therapeutic areas.


Book a Demo with PEMAC

If you are interested in finding out more about PEMAC and our CMMS system, please enter your details below.


[contact-form-7 404 "Not Found"]